Downer – Black Sand Dredge Transport

Client Name

Downer / Mineral Technology / Black Sand Egyptian Company

Project

Dredge Transport from Alexandria port to Black sand site at El Burulus including all the required permits and road modifications.

Year

2021

Package

  • Dredge which are 2 Parts to be assembled in water and towed to Burj El Burulus by sea and then pulled out of the water by air bags then transported by low bed trucks to the Black Sand Site
  • General Cargo to be transported by trucks directly to Black Sand site
    • 3 Trucks
    • 3 Low Bed Trucks

Activities/Services

  • Logistics (Sea Towing, Low bed trucks for transportation, Permits and roads modifications)
  • Civil Works (Ramp Design for dredge extraction and Construction, roads modifications in the route of the dredge)
  • MEP Works (Lighting poles dismantle and reinstall)