Downer / Mineral Technology / Black Sand Egyptian Company
Project
Dredge Transport from Alexandria port to Black sand site at El Burulus including all the required permits and road modifications.
Year
2021
Package
Dredge which are 2 Parts to be assembled in water and towed to Burj El Burulus by sea and then pulled out of the water by air bags then transported by low bed trucks to the Black Sand Site
General Cargo to be transported by trucks directly to Black Sand site
3 Trucks
3 Low Bed Trucks
Activities/Services
Logistics (Sea Towing, Low bed trucks for transportation, Permits and roads modifications)
Civil Works (Ramp Design for dredge extraction and Construction, roads modifications in the route of the dredge)
MEP Works (Lighting poles dismantle and reinstall)